
I-95 BRI Project – PADOT, 6-0
Rehabilitation of Betsy Ross Bridge Interchange ramps. Many of them are curved-girder structures. Seismic evaluation was performed using 3-D finite element methods.

I-95 RES Project – PADOT, 6-0
Provided seismic design consultation to the prime consultants on a complex viaduct structure.

Nescopeck Creek Bridge Seismic Design –
PennDOT, 5-0
Seismic design of this two span continuous pre-stressed concrete bridge.